Generic Simulation and Scheduling Tool for Powder Spray Coating Facilities
Reducing energy consumption, operation costs and investment risk. Using and utilizing painting lines in an optimal way. Safeguard investments in new and existing facilities.
Description
Powder spray coating facilities belong to the largest energy consumers in Swiss industry. The plant configuration and the production sequence must be optimized for economical and ecological operation. As yet there is no satisfactory tool for this. Our goal is to solve this optimization problem by combining methods from simulation, optimization and computer-aided design and to provide it as a generic planning tool for painting plants.
Key Data
Projectlead
Prof. Dr. Lukas Hollenstein, Fabian Luccarini
Deputy Projectlead
Adrian Lötscher
Project team
Ivo Berchtold, Adrian Busin, Melih Derman, Florian Eggenberger, Ramon Kramis, Armin Walker, Othmar Winiger
Project partners
wirth+co AG; E. Luterbach AG
Project status
completed, 08/2015 - 12/2017
Funding partner
KTI-Projekt / Projekt Nr. 17655.1 PFES-ES
Project budget
378'825 CHF
Publications
-
SimLack : simulation-based optimization and scheduling of generic powder coating lines
2019 Hollenstein, Lukas; Lötscher, Adrian; Luccarini, Fabian
-
SimLack: simulation-based optimization and scheduling of generic powder coating lines
2018 Hollenstein, Lukas; Lötscher, Adrian; Luccarini, Fabian
-
Mit Advanced Dynamic Planning Energiebedarf, Betriebskosten und Investitionsrisiken reduzieren : am Beispiel von Lackieranlagen
2016 Hollenstein, Lukas